M215 Installation and Operation
2014 Enphase Energy Inc. All rights reserved. 141-00012 Rev 06
33
Voltage Type and Conductor Count Options
The voltage types are either 240 VAC split phase or 208 VAC three phase. All cable connectors bear
labels indicating the cable voltage designation. Typically used for residential applications, 240VAC
includes four conductors. Three-phase 208 VAC cabling includes five conductors, and is used for most
commercial installations. Because Enphase microinverters output onto two phases, three phase cabling
balances the phases by rotating conductor use from one microinverter to the next as shown on page 23.
Cabling Length Options
Engage Cabling is available in shorter lengths with 30-40 connectors, depending upon voltage type.
Longer lengths can be ordered and cut to suit per order. Ordering options include:
Model Number
Voltage type/
conductor #
Connector
count
Connector
spacing
PV module
orientation
Approx. weight
ET10-240-40
240 VAC,
4 conductor
40
1.025 m (40”)
Portrait
18.1 kg
(40 lbs)
ET17-240-40
240 VAC,
4 conductor
40
1.7 m (67”)
Landscape
20.4 kg
(45 lbs)
ET10-208-30
208 VAC,
5 conductor
30
1.025 m (40”)
Portrait
13.6 kg
(30 lbs)
ET17-208-30
208 VAC, 5
conductor
30
1.7 m (67”)
Landscape
15.9 kg
(35 lbs)
ET10-240-BULK
240 VAC,
4 conductor
240
1.025 m (40”)
Portrait
over 90 kg
(200 lbs)
ET17-240-BULK
240 VAC,
4 conductor
240
1.7 m (67”)
Landscape
over 90 kg
(200 lbs)
ET10-208-BULK
208 VAC,
5 conductor
240
1.025 m (40”)
Portrait
over 90 kg
(200 lbs)
ET17-208-BULK
208 VAC,
5 conductor
240
1.7 m (67”)
Landscape
over 90 kg
(200 lbs)
Planning for Cable Lengths and Type
The Cabling System is flexible enough to adapt to almost any solar design. To determine the length and
cable type that you need, apply the following considerations:
Account for the number of Enphase Microinverters to be installed on the AC branch
circuit. Make sure to allocate the correct number of connectors, including extra connectors for
gaps and turns.
Plan for additional cable length to reach from the AC branch circuit junction box to the
first microinverter. If greater than half a connector interval is needed, you may need to allow for
one (or more) unused connectors in order to span this distance. You must cover unused
connectors with Enphase watertight sealing caps.
Minimize the number of unused Engage Cable connectors with three-phase systems. When
cable connectors are left unused on a three-phase system, it creates a phase imbalance on the
branch circuit. If multiple cable connectors are skipped over multiple branch circuits, the
imbalance can multiply.